Awesome Reviewers

Verification · Intent and spec conformance · Plan and spec traceability

Gap analysis

Report where the implementation departs from the plan's intent.

How to build it

  1. Compare each requirement's status in the plan to the code and tests.
  2. Mark each requirement as done here, done elsewhere or not started.
  3. Grade each gap by severity against the plan's intent.

Signals in a repository

  • A plan or spec file with a status column for each requirement.
  • A gap report or tracking issue that lists open requirements with severity.
  • Pull requests that close a numbered requirement from the spec.

In practice

No scanned repository runs a tool for this check. The steps above are the only guidance.